The Northampton project
Phase 1
Site before starting work
-
Cinema Room window, knocking off plaster to fix xmet onto the walls to strengthen them up before a sand and cement render
-
Old Window
-
Old Gas Pipe
-
Site Preperation, covering the area where all of the soil will be dropped for a grab lorry to come and pick it up from to remove 16 tons at a time instead of skips
-
Taking down the new old extension
-
Original Building showing an old bricked up window that was to be taken out along with the sill and rebricked up to make it look as though it were never there
-
Before Shot of the existing house where the extension is going to go
-
Original detailed paper mache mold to be copied so that they can be reproduced in the cinema room
-
Original detailed paper mache mold to be copied so that they can be reproduced in the cinema room
-
Old lead gas pipes for gas lights
-
Rubble on the board from the old new extension ready to be taken away with the grab pile (we were keeping the bricks coming out of the existing Victorian house to reuse but the modern bricks from the old new extension were rubbish)
-
-
Before shot of the old new extension and the Victorian house
-
Before shot of the old new extension and the Victorian house showing bolted plate that was used to retain the wall which had fallen away from the building due to subsidence/settling of the foundation
-
New List Item
Surveying the site
-
Foundations are not level
-
Evidence of subsidence/settling of the footing
-
Kitchen ceiling is not level - evidence of subsidence
-
Evidence of subsidence - bathroom is not level by 60mm, serious evidence of historical subsidence
-
First floor - the level shows that the house had fallen away by about 60mm, we would have to allow for this when ordering the steel and refurbishing the bathroom so that the final product is level
-
Door casings and doors show evidence of subsidence
-
New List Item
Digging out footings
-
Large 1400mm square cutout for the steel goalposts going in to support the first floor structure
-
Acro supporting first floor in place while the footings are dug
-
Footings dug out and acro put in place to support steel above while we knock the side wall out
-
Footings
-
Footings
-
Shutter to close off, ready for pouring footings
-
Measuring for oversight
-
Footings dug
-
Basement
Attic Before
Internal Doors
Phase 2
Steelworks
First Floor
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
New List Item
-
-
New List Item
-
New List Item
-
New List Item
-
New List Item
First Floor Flooring
Bi Fold Doors
New Water Connection
Attic
Second floor
Basement
Videos
This is the final house - completely built and furnished